Chapter 356 of 835
Chapter 356: Construction began
5 min read1,319 words
On the original square in front of Linshi Railway Station, a drilling rig has
been erected, and it is drilling down.
"Be careful to clean up the gravel and dirt that came up from the drill, and
don't let them pile up around the drill hole!" Cao Daren was standing next to
the drill bit full of energy at the moment, wrapping himself up like a bear
and directing several people who helped by the drill rig. worker.
The feeling of returning to the old profession is a very rare opportunity for
Cao Daren, which makes him full of enthusiasm for this job.
Chen Xin helped him find these workers. After the rescue team opened an
ambulance station to treat patients, some mildly ill patients have recovered
after two days of rest and are ready to work.
Most of them were allocated by the Linshi Municipal Government to places in
urgent need of manpower. Chen Xin still relied on the face of the rescue team
and the Linshi Municipal Government itself wanted to clear the train station,
and only then did ten workers from the staff. , Help him and Cao Daren work
together.
Since Cao Daren agreed to help, he wouldn't be wrong. After Chen Xin helped
him find workers, he pulled his rig to the railway station square with more
than ten meters of snow. He didn't conduct any geological surveys, so he just
set it up. Drill with the drill bit.
This is not Cao Daren's reckless efforts, but the entire city of Linshi is
located in a geothermal fissure, and you can drill into the geotropics if you
drill down.
This geothermal fissure is the largest geo-tropical zone in Hunan Province. It
runs through the entire province, but also reaches Hubei Province. Chibi City,
Hubei Province, where Chen Xin once visited, is also in this geo-tropical
zone.
And the geothermal resources contained in this tropical zone are quite rich.
The only two hot springs in Hunan Province whose water temperature exceeds
100°C are the embodiment of this tropical zone.
Although Cao Daren is drilling the well with great enthusiasm, he is not
without worry.
"Writer, this underground snow is so deep. If we drill into the geothermal
layer, the heat will melt and the snow will melt, which will affect the
stability of the rig. And your purpose is to evaporate the snow here. It is
impossible to stand the wellhead off the ground. It's more than ten meters
high, right?" Cao Daren found Chen Xin, who had just returned from collecting
materials, and told him his concerns.
Chen Xin naturally considered this issue and comforted Cao Daren: “Don’t worry
about this. I will put a support column under the rig to fix the rig. Even if
the snow starts to melt, the support column will not release the rig.
problem."
"Okay, since the writer is prepared, I don't worry." Cao Daren didn't ask Chen
Xin where to stand the wellhead. In his opinion, as long as the drilling rig
can be kept stable, the rest is not a problem.
Chen Xin saw that Cao Daren had no other doubts, so he carried the scrap metal
he had just collected to the electromagnetic metallurgical furnace set up
aside.
In order to facilitate the construction, Chen Xin has moved this
electromagnetic metallurgical furnace here, and carried out a second upgrade,
adjusted some of the problems encountered in the previous use, and made it
more efficient and convenient.
Put the scrap metal on the tray in the center of the machine, turn on the
machine, and after a burst of sparks and clouds of steam, a piece of fiery red
spherical metal ingot was smelted.
Turn off the machine, let the metal ingots cool down quickly, and then fall
back onto the tray. While Chen Xin picked up the metal ingots with his
mechanical arm, he did not forget to clean up the residue on the tray and
threw it into an iron bucket next to the machine.
These residues are all waste materials, but they should not be thrown around.
They will be collected and processed together.
Spherical metal ingots are of course useless, and Chen Xin still needs to
perform secondary processing.
With the help of a robotic arm, the metal ingot, which was originally just a
pit, was processed into various metal parts, and then put aside.
It’s just that most of these parts seem to be long strips of metal and various
rings. Until Chen Xin completely assembles them, it is impossible to see what
it is.
But Chen Xin doesn't care about it. These parts are made according to the
drawings he stored in the microcomputer on the robotic arm. Each part has a
corresponding number. Then, you only need to assemble it according to the
drawings.
As for what is being assembled, even if someone has seen Chen Xin's design
drawings, it is estimated that they will have to guess what they are.
After all, before Chen Xin made this thing, no one in the world could build a
large radiator with a height of more than ten meters.
This thing is a device designed by Chen Xin imitating the heating hub in "The
Age of Ice and Vapor". It looks like a heating hub in a game, but the working
principle is completely different. This is not coal burning.
Its bottom will be connected to the geothermal well drilled by Cao Daren, and
the underground heat energy will be continuously extracted through the
pipeline circulation, and then transmitted to the ground and then distributed
through the heat sink on the heating hub, thereby increasing the temperature
around the heating hub.
This is a rather crude and wasteful way of using energy, because it dissipates
heat directly to the air, and there is no insulation around it. It takes a lot
of heat to increase the temperature, and if this heat is used to generate
electricity or build a building House heating is much more efficient than
this.
But for Chen Xin, this is the most appropriate way to achieve his goal of
evaporating the snow around the train station.
In addition, as far as he has a system, he can completely improve the drawing
to make this heating hub work more efficiently. UU看书www.uukanshu.com really
forms a stable heating field around it like a heating hub in a game. .
This is not difficult for Chen Xin to achieve.
And according to his plan, after the heating hub construction is completed, he
will continue to upgrade the heating hub, transform it into a real energy
tower, and really extend the geothermal well at the bottom of the tower into
the dry hot rock formation, with high efficiency Of mining deep geothermal.
As for the waste caused by rough use, there is no need to worry about it.
Compared with the geothermal resources used by Chen Xin, the geothermal
resources contained under the stratum can be regarded as endless.
Unless the Blue Star’s core is extinguished, the geothermal resources will be
inexhaustible. As long as you pay attention to the mining method and do not
cause geological damage or local over-exploitation, there will be no problem.
Relying on the electromagnetic metallurgical furnace, Chen Xin continued to
smelt the collected scrap metal, and had already assembled most of the parts.
Next, as long as Cao Daren digs the well, Chen Xin can start building this
heating hub.
As long as the heating hub is put into operation at that time, the continuous
heat will melt the surrounding snow and achieve Chen Xin's goal of clearing
the snow here.
But thinking that all the snow will melt by then, Chen Xin also has to
consider a question, that is, how to drain the snow after it melts.
(Https://)
First set a small goal, such as 1 second to remember: shukeju mobile version
reading URL: