Chapter 375 of 835
Chapter 375: Camp relocation
5 min read1,324 words
The operation of the heating hub has undoubtedly injected new hope and
vitality into the city.
Although only one heating hub is currently in operation and the other heating
hub is still drilling wells, the heating hub that is currently in operation
has not performed too dazzlingly, but it is standing next to the snow pit.
Looking at the melting snow, no matter who it is, there will be a feeling that
hope is gradually igniting.
Insert an app: Perfectly re-engrave the old version of the book-chasing
artifact, an interchangeable app-Mimi Read.
However, Chen Xin did not allow many people to approach the heating hub, and
even standing next to the snow pit was forbidden, because as the temperature
rises, the snow gradually melts, and the wall of the snow pit also collapses
on a small scale. The impact is small, but there is still a certain degree of
danger.
Fortunately, this kind of thing is easy to handle, as long as it is forbidden
to approach the snow pit at will.
At present, the heating hub has entered a smooth operation, in addition to the
need for continuous drainage, no additional maintenance is required.
The entire heating hub is driven by electricity. Although there are plans to
use thermal energy to generate electricity in the future, considering that
there is no generator connected to the heating hub, and there is no excess
thermal energy for power generation, so Chen Xin The heat supply hub is still
powered by isotope thermoelectric batteries.
I have to say that the isotope thermoelectric battery is quite easy to use.
Chen Xin only needs to install the battery into the heating hub, and one
battery is enough to maintain the entire heating hub running smoothly for ten
years.
In this process, workers only need to regularly perform normal maintenance and
overhaul of the heating hub to complete all its maintenance work.
Because when Chen Xin designed the entire heating hub, he took stability and
reliability as the main design criteria, and the heating hub he built was
naturally quite reliable.
Of course, limited by materials, the entire heating hub still needs regular
inspection and maintenance to avoid damage due to accidents.
Because the snow around the heating hub is constantly melting, Chen Xin and
the workers and the geological prospecting team have evacuated their original
camp and re-established the camp in a new location.
However, this camp is still a temporary camp. After the spread of the heating
field is completed and the snow within a radius of two hundred meters has
melted, Chen Xin will take the workers and the geological exploration team to
the heating hub. Within the heating field.
This is of course to enjoy the warm benefits brought by the heating hub, and
on the other hand, to be able to maintain the heating hub nearby.
After all, this thing is also the first time it has been put into use. Nobody
knows whether it will malfunction or not.
The construction of the new camp is not too troublesome. Chen Xin's power
armor is paired with a robotic arm. In this case, one person is enough to
match everyone else.
The group found a building that had not been completely buried by the snow,
and at the same time it was a complete building. They dug a row of snow pits
against the building wall, set up a tent under the snow again, and built a new
one. Camp.
The new campsite is farther away from the railway station and the heating hub
than the old campsite. However, it is more stable against the exterior wall of
the building, and it also serves as a windbreak for the building completely
buried in snow.
But because this is only a temporary camp, as long as it can live in, it
doesn't work too hard.
However, Chen Xin spent a lot of time on the place where the electromagnetic
metallurgical furnace was installed. Every time the electromagnetic
metallurgical furnace was in operation, a large amount of heat would be
released, so Chen Xin had to choose a firm place without any thoughts. , To
avoid accidents such as the snow-covered ground being melted by heat, causing
the machine to tilt and tilt.
The reason why the electromagnetic metallurgical furnace is attached so much
importance is because the next few other planned heating hubs still need Chen
Xin to provide spare parts, especially the No. 7 Middle School where Cao Daren
is drilling wells, but the return water well has already been booked. To build
a second heating hub.
Therefore, Chen Xin must hurry up and finish the production of related parts
and components for the second heating hub to avoid delays in the construction
period.
This is also one of the reasons why Chen Xin chose the building as the
location of the new camp. Clearing an open space on the roof of the building
is enough to house the electromagnetic metallurgical furnace.
After all, the furnace made by Chen Xin is not heavy. As long as it is placed
on the cement floor, it can stand stably, and the cement floor obviously does
not melt as easily as the snowy ground, which is enough to ensure the smooth
operation of the induction metallurgical furnace.
Entrusted by the scientific research department to send him the blessing of
materials, the second heating hub manufactured by Chen Xin no longer needs to
go out to collect scrap metal by himself. The materials transported with the
geological exploration team can fully meet Chen Xin's needs.
These materials are undoubtedly much better than the scrap metal collected by
Chen Xin before, and different materials classified according to the
requirements of Chen Xin can be used for different parts according to the
difference in material properties. UU Reading www.uukanshu. com can improve
the performance of the heating hub itself.
To give a simple example, the heat sink of the first heating hub is made of
scrap copper recovered by Chen Xin. Although copper has better heat
dissipation performance than iron, Chen Xin’s induction metallurgical furnace
can also be used in the smelting process. The materials are purified and
processed, but the quality of these heat sinks made of scrap copper is
obviously inferior to the old heat sinks made of new materials.
After all, one is only the product of secondary smelting after scrap copper
recovery, and the other is a copper alloy specially made with the goal of
improving heat dissipation performance. Although the former can also meet the
design requirements of the heating hub, it is obvious that the latter’s heat
dissipation efficiency and The material performance is higher.
Obviously, the scientific research department that delivered materials to Chen
Xin got all good things. With these materials, even if Chen Xin did nothing
but made the materials into parts, it was enough to increase the efficiency
and output power of the heating hub. Improve by 10%.
If you use the system to upgrade to a higher level and optimize the design,
even without actual data support, Chen Xin feels that the work efficiency and
output power can be increased by 20%, and the radius of the heating field
deployed by the heating hub can even be increased. To two hundred and fifty
meters or even three hundred meters.
According to another calculation model designed by Chen Xin before, when the
heat supply hub retracts the radiator plate and does not open the heating
field, if all the heat energy output is used for power generation, it is
enough to achieve 1MW·h of power generation.
As long as a few such heating hubs form a heating network, it is sufficient to
meet the electricity demand of a city.
Even in today's general environment, these heating hubs need to consume a
considerable amount of heat energy for heating, and the remaining power
generation is enough to meet the needs of use.