Chapter 383 of 835
Chapter 383: Shield machine
5 min read1,373 words
Text Chapter 381 Shield Machine
Manufacturing a shield machine is actually not as difficult as many people
think, because the world's first shield machine was born at the end of the
eighteenth century two hundred years ago, and it used human hand excavation
and today's large mechanized shield Compared with the construction machine,
there is no high-tech part.
However, although the early shield machines were simple in structure and
lacked high-tech features, they were the originator of today's modern shield
machines and the source of their principles.
Chen Xin wants to build a shield machine himself, unless he finds another way
to design it from scratch, otherwise, the principle of the shield machine that
has been laid for more than two hundred years cannot be avoided.
The principle of the shield machine is not complicated. The main principle is
to construct a "shield" to protect the tunnel and resist tunnel collapse while
the tunneling machine is digging forward.
Of course, with the advancement of science and technology, although the
principle of the current shield machine is still the same, some large or super
large shield machines no longer need to construct a "shield" during the
tunneling process. They can directly integrate the shield during the
excavation process. The repair of the tunnel is convenient and quick.
The basic principle of the shield machine is derived from a marine creature-
the ship maggot, which will continue to dig on the wood and secrete mucus
during the digging process to protect the wood around its body from being
corroded and expanded by the seawater. .
Therefore, as far as Chen Xin is concerned, he does not need a formal shield
machine, in fact, he only needs to build a machine that can quickly dig in the
snow, and support the excavated tunnel without collapsing before the pipeline
construction is completed.
These two points are actually not difficult to achieve.
Snow is not condensed ice. Although it has a certain degree of hardness, it is
easier to excavate than soil. Moreover, the internal texture of the snow is
uniform and there is no complicated structure. There is no need to consider
the rock formations or other things encountered during excavation. The problem
of complex geological structure.
As for the second point, it is easier to solve. With the current ambient
temperature, you only need to slightly heat the excavated tunnel wall during
the excavation process, so that the snow on the tunnel wall melts and quickly
condenses, and a layer of ice can be formed. The shell is used to support and
protect the tunnel from collapse.
After all, it’s just snow, not a complicated geological structure. A layer of
ice crust is enough.
With these two points clarified, elementary school students may not be able to
make a shield machine that can be used, but middle school students with
stronger hands-on skills can complete this design.
A cylinder is used as the main structure, and a blade or drill bit like a fan
blade is made of harder metal in the front. A circle of electric heating wire
is laid on the shell for melting snow and internal insulation. This thing is
basically completed and capable of construction Demand.
As for the rest, it is nothing more than optimizing the internal mechanical
structure and adding a little auxiliary function.
For example, the fan blades or drill bits in the front can be shaken manually,
or they can be mechanically powered by adding a motor. The digging snow can be
transported manually or mechanically. Even Chen Xin is willing to spend some
time and effort. The entire shield machine is made fully automatic, and it is
possible to dig by itself as long as it is put in the snow, and it is also
possible to complete the entire construction.
It's just that Chen Xin hesitated, how big a piece of equipment he had to
build.
It is naturally a simple and rude way to build a large tunnel, dig a tunnel
directly, and then the workers go in and erect the pipeline. In this way, the
machine does not need to be too complicated and advanced, and it can be
digging quickly.
But in this case, the construction speed is relatively low. After all, the
tunneling surface will be relatively large if it is built. The amount of snow
work that needs to be excavated will be doubled and the construction period
will be longer.
As for building a small one, or simply the thickness of the pipe, it will
undoubtedly save a lot of trouble while digging and connecting the pipe.
It's just relative. If you build a small shield machine, the technical content
will undoubtedly be improved a lot.
After thinking about it, Chen Xin weighed the pros and cons between the two
and chose a small shield machine.
After all, for him, improving the technical content is the easiest thing.
With a multi-functional robotic arm, it is not difficult to process such a
shield machine. You only need to cut a section of the pipe. One end of the
pipe is equipped with a drill bit for digging, and a pipe is connected inside
to remove the excavation. The "shaved ice" that came down, and finally
connected to the motor to provide power and power, this thing is even done.
Of course, although this thing is said to be done, it can already be used to
start work, but if it is really put into use and rely on it for tunneling
operations, Chen Xin still needs to give him a small promotion.
For example, it is necessary to install a microcomputer on it so that the
equipment can be remotely controlled or programmed to operate automatically.
Chen Xin even considered attaching a 3D printer to this little thing, which
can directly print the pipeline while digging, and even the laying of the
pipeline itself can be omitted.
However, after thinking about it, Chen Xin didn’t do so. He just added a
remote control to the small shield machine he made~www.mtlnovel.com~ to ensure
that the machine can be moved forward, backward, and stopped by remote
control. That's it.
The final shield machine is like a bullet head. The front end is a hollow
drill bit, which cuts the ice and snow through the arc-shaped cutting edge,
and then ** the cut snow away through a pipe inside the drill bit to ensure
the drill bit can move forward smoothly.
In addition to the pipeline, there is a heating ring behind the drill bit,
which is used to heat the snow around the entire shield machine, so that the
snow melts and then freezes quickly under the influence of low temperature,
forming an ice crust to stabilize the tunnel.
The power of the entire shield machine comes from a small power motor
installed in it by Chen Xin, which is responsible for driving the drill bit
and the crawler wheels at the bottom of the shield machine forward, and the
power supply relies on a small battery.
After Chen Xin completed the shield machine, he took it to a nearby snowy
field and tried it. The results of the experiment were very satisfactory.
The drill was digging very fast in the snow. Chen Xin only allowed it to drill
for about three to five minutes, and then drove a distance of more than two
meters. According to this speed, one hour was enough to dig 20-40. The
distance of meters is much faster than digging by manpower.
Seeing that the shield machine he made was quite effective, Chen Xin was
satisfied and prepared to let the workers start preparing for construction.
But at this time, some workers asked Chen Xin a question. The shield tunneling
machine can indeed dig quickly, but how should the pipeline be put into the
tunnel?
The diameter of the shield machine is only a few centimeters thicker than the
pipe. It is no problem to put the pipe straight along the drilled tunnel, but
this pipeline is not a straight branch line, but there is an elbow in the
middle.
Still looking for "Can I upgrade the shelter" free novel?
Baidu direct search: \"\"It's easy to read novels!