Skip to content

Chapter 600 of 835

Chapter 600: New mining machinery

5 min read1,297 words

Genius remembers this site address in one second: []The fastest update! No

ads! While the designers are working hard to complete the design of the dome

city, Chen Xin is also perfecting a new design.

It's just that unlike the designer's perfect design, Chen Xin is adjusting his

design through the nanomolecule projected from the watch on his wrist.

This is the prototype of the previous mining Titan. Because it will not be

mass-produced, it is only used for design and technical verification, so after

the simplified model of mass production is completed, this prototype will not

be sent. It can only be used in the warehouse.

Chen Xin felt that this was too wasteful, so he planned to improve it a bit to

see if there was any chance of it being used again.

The answer is of course yes. Such a Titan can't be useless, even if it is only

used as a transportation vehicle, it can also come in handy, but the input and

output are disproportionate.

Of course, Chen Xin would not do this. What he envisioned was to put it in

more useful occasions and consider making it more mass-produced.

Although it has been proved before that this prototype is designed to be

unreasonable and not suitable for mass production, this is not a problem for

Chen Xin.

The unreasonable design of this prototype is largely because it is not

suitable for working in underground mines.

In addition, it is a Titan itself, and ordinary workers can't easily get

started, and they need to carry out special driving training, which

undoubtedly increases the difficulty of its promotion.

If it is the kind of large-scale mining machinery that can effectively improve

mining efficiency, it’s okay, but it’s a big deal to train a professional

driver.

Before the disaster, large industrial and mining companies would have such

operators specially trained to operate those professional equipment. This is

not a big deal.

It's just that the scope of application of the prototype is too narrow.

Professionally trained drivers drove the expensive Titan to mine. At the same

time, the output of mining has not increased much, and the input and output

are still disproportionate.

Therefore, if Chen Xin wants to improve the prototype, the most important

thing is to increase its scope of application and reduce the cost at the same

time.

In Chen Xin's view, the design of the prototype in the direction of mass-

production simplified machine is an idea, but its original design idea can not

be considered as a problem.

If it is only for personal use, the cost of exoskeleton is much lower than

that of Titan, and the operation is simple.

But if it is used as a mining vehicle, the prototype still has development

potential.

Chen Xin has investigated before that most of the mines currently operating in

China are underground mines. In the past, the open-pit mines that were easy to

mine were mostly affected by disasters and the current snow environment. To

resume production.

If the prototype can be transformed into a model that can be used for large-

scale open-pit mining, it can undoubtedly play a great role.

But if you want to use Titan to mine in an open-pit mine, the prototype is

undoubtedly designed to be small.

It should be understood that open-pit mines are not comparable to underground

mines, where large machinery is usually used to directly dig up the entire

mountain, crush all the rocks and veins together, and then screen out the ore.

For this scale of mining, the efficiency of the prototype is undoubtedly not

applicable.

Although it can be used more openly on the ground, the pneumatic pick is

undoubtedly very inefficient in this case.

Therefore, it is necessary to redesign the mining tool of the prototype, and

at the same time increase its size in order to be able to have higher mining

efficiency.

However, while Chen Xin was adjusting in this way, he suddenly found that he

was doing so not so much to improve the prototype, as it was to redesign a

machine that could be used in open-pit mining.

Thinking of this, he simply jumped out of the category of Titans and

redesigned directly with the goal of large-scale mining machinery.

First of all, the original six-legged walking mode can be retained. Although

the crawler-type chassis of normal large-scale construction machinery is also

good, but in a more complex environment such as snow or mines, the walking

stability brought by the six supporting feet is undoubtedly It is unmatched by

wheels and crawlers.

The design of the ore cabin can be improved into a ore bucket. A closed ore

cabin is actually not very necessary. Whether it is underground or on the

ground, it is much simpler to have an open ore bucket directly.

As for the key to transformation, mining equipment is undoubtedly the top

priority.

The original pneumatic pick is really good for broken rocks, but it is only

for human use, and the production efficiency is not high enough.

If it is applied to such a large-scale mining machine, it is better to

exchange two big hammers directly and return it directly.

Therefore, Chen Xin replaced this redesigned mining machine with two air

hammers, which will be used to directly crush large rocks and smash the rock

walls.

In addition, the original two auxiliary machinery Daao still remain, they will

still be used to collect ore.

Only now that the size is enlarged, the mining machine designed by Chen Xinxin

does not look like a half-human, half-spider monster, but more like a large

spider with teeth and claws.

Chen Xin canceled the humanoid design of the upper body and simply made this

large mining machine into a spider shape, which has two huge forearms,

equipped with air hammers and sharp front ends, which will be used to drill

into the rock wall. Crush the rock with an air hammer.

The six supporting feet on the side are used to assist walking, and only the

two smaller auxiliary large ao at the front end are used to load the ore into

the mine bucket.

The mine bucket still uses the front-end opening method to load goods directly

from the head into the mine bucket instead of having to go around to the back

and then throw it in.

And its size has been enlarged a lot, the whole spider looks like a big truck.

Its driving system and cockpit were simplified by Chen Xin. Uukanshu.com has

become an existence similar to the cockpit of a truck, where the driver only

needs to pull the joystick to control the machine to move forward, backward,

and work.

Although its driving is still a bit complicated, and even inconvenient because

it is pulling the joystick, it is undoubtedly much easier to train a truck

driver than to train a Titan driver.

Next, you only need to amplify its engine output, so that it has more surging

power and stronger output, and it can become a very useful mining machine.

Of course, before this, it is still necessary to reduce the cost as much as

possible.

However, Chen Xin's method of reducing costs is more subtle than the previous

method of directly disassembling a Titan into an exoskeleton.

What's more, the volume of the large machinery itself is placed here, and it

is impossible to reduce its manufacturing cost to the end at once.

Fortunately, Chen Xin transformed it from Titan into a large machine, many of

which can be replaced, which invisibly reduced a lot of costs. In the end,

once calculated, the volume is already a large machine twice the size of the

original prototype. The cost is even much lower than the prototype.