Skip to content

Chapter 608 of 835

Chapter 608: New city construction

5 min read1,229 words

On the construction site of the new city, Chen Xin is holding a drawing and

discussing construction issues with the engineer responsible for levelling the

land.

"When you level the land, please be sure to follow the demarcated area. Many

places in the new city need to be reserved for planting trees. Don't compact

the land directly. Then planting trees and plants will be troublesome. "After

talking about the specific question, Chen Xin said to the engineer half

jokingly and half seriously.

Although this is only a half-joking sentence, it is not a nonsense by Chen

Xin.

Although in order to build a new dome city, the entire land needs to be

leveled, and the area for the construction of the new city and the dome

support needs to be compacted, but the green area delineated in the new city

must be set aside, even the soil It needs to be treated again, so as not to

affect the subsequent planting of plants.

In the final analysis, this is also because plants are almost extinct in the

external natural environment, and only a few seeds are buried deep in the soil

to escape the previous catastrophe, which can be regarded as the last kind of

fire for nature.

It's just an unknown number when the last kind of fire can reignite. After

all, in such a cold environment, let alone plants germinate, even survival may

be a huge problem.

Under such circumstances, it is natural to pay special attention to

artificially planting plants for greening. After all, it is not like before

the disaster. It is nothing more than a costly thing to plant and replant.

Now every plant is extremely precious, and can only be obtained through

artificial greenhouse cultivation. The quantity is scarce and cultivation is

not easy, and the loss of any one is unacceptable.

The engineer naturally knows this, and someone has already solemnly explained

to him when he came to understand the main points of the construction.

Therefore, the engineer also nodded very seriously and replied to Chen Xin:

"Academician Chen can rest assured that we are all professional construction

teams. We have also taken over a lot of major projects at home and abroad. You

should be clear about everything. There will be no problems."

When the engineer said this, he seemed confident and confident.

But what he said is not bragging. Although some of the workers are transferred

from other places, those are just grassroots workers. The construction team

brought by the engineers is truly experienced and has taken over many major

projects at home and abroad. It is a very experienced team.

So he is naturally full of confidence when he speaks, and he is also confident

to complete the task.

Listening to the engineer's words, Chen Xin naturally felt relieved to him,

did not say anything, turned his head and looked at the construction drawings

in his hand again.

This is the general construction drawing of the new city. After several rounds

of modification and adjustment, the construction design drawings of the Dome

City have finally been finalized.

This set of drawings was finally adopted after Chen Xin integrated the plans

of the various design institutes. After all, after reading the design

drawings, the design institutes confirmed that the design that integrates the

best of everyone is indeed better than Their individual design should be

excellent.

As a result, the final design drawing was not contracted to which design

institute, but divided into different design bids, and distributed according

to the design parts adopted by each design institute, and each design

different parts. .

After the design institutes have designed the parts they are responsible for,

this set of design drawings has been released.

Each design is a different part, and some problems occurred when they were

finally integrated, but after coordination, these problems were smoothly

resolved and became the design drawing that was finally handed over to the

construction team.

Of course, what the engineer gets now is only part of the design drawings of

the foundation part, and Chen Xin is only holding the design drawings.

After all, it is a design drawing of an entire city, and it is still drawn on

paper. All the drawings can fill a truck.

Therefore, the drawing can only be the part that each is responsible for, and

only Chen Xin and the higher-level department have the general drawing.

Fortunately, this is not a problem. As long as the construction team strictly

follows the drawings, there will be no problems, and various design institutes

have also sent designers on the construction site for this matter. If there

are any problems, they will be adjusted in time. .

When Chen Xin and others discussed construction issues, the construction site

was also in full swing.

This was originally an industrial zone in the county and district of the city.

Before the disaster, some light industrial factories were mainly opened here.

It was originally a fairly prosperous industry, which brought good financial

income to the county.

However, after the disaster, this place was completely abandoned, and the

original factory building here was basically turned into a ruin after being

destroyed by fire, freezing, and burying in snow.

Therefore, the workers did not have to work hard to clean up, and the original

factory building was nothing more than a colorful tiled house with steel

spans. After the fire was frozen, there was basically nothing left.

The only thing that is difficult to gnaw at is the cement base on the ground.

These bases poured with reinforced concrete are still a little troublesome if

they are dismantled by manpower alone.

However, this trouble is not as troublesome as cleaning the snow on the

construction site. In addition, the construction has used a lot of

construction machinery, and the overall progress is still very smooth.

Especially since it was originally an industrial zone, there are not many

buildings on the land, and the terrain itself is relatively flat, making it a

very ideal new city construction land.

Chen Xin watched the workers demolish the original building, and the cement

and roads on the ground were also shoveled. Some concerned asked the engineer

on the side: "Do you want to throw away the construction waste? "

"No, these removed reinforced concrete will be recycled. The reinforced steel

will be used for other purposes. After treatment, construction waste such as

cement bricks will be used as the foundation filling of the new city." The one

who was speaking was Chen Xin. A designer, the foundation part is the

responsibility of his design institute.

Hearing him say this, Chen Xin became interested and asked him: "Do you want

to recycle?"

"Yes, resources are scarce now. Although these construction wastes have lost

their original function, after being crushed again, bricks and cement blocks

are good foundation materials and also have the function of cold and heat

insulation. It is laid on the foundation, and new reinforced concrete is

poured on it. It is a good foundation." The designer seemed to be very excited

when it came to this, and introduced to Chen Xin endlessly.

Through this designer's introduction, Chen Xin couldn't help but nod slightly.

The resources are indeed tight now, and the resources that can be recycled and

reused like this cannot be wasted even if it costs something.