Chapter 618 of 835
Chapter 618: Environmental protection construction
5 min read1,263 words
"At present, the land clearing and leveling work has been completed. We are
currently excavating the foundation of the dome and the foundation of the
urban architectural planning part." In a conference room on the site, the
engineer is introducing the construction progress of the project to Chen Xin.
The excavation of the building foundation is the top priority of the entire
construction project, and in a sense, it is not too much to regard it as the
most important part.
The foundation of "a tall building rises from the ground on the ground" is the
foundation that determines whether the building is firm and durable.
If the foundation of a building is not well laid, then even if the building is
built, it is still a paper house that can be pushed down.
This point does not need to be emphasized deliberately for Yan Guo, a major
infrastructure country, and the Yan Guo engineering team can complete the
construction in accordance with the requirements of the project without
reminding.
"Well, I have seen this just now, and it seems that you are doing a good job."
Chen Xin smiled on his face, as if he was very satisfied with the construction
progress of the engineering team.
Hearing what Chen Xin said, the engineer immediately smiled. Although Chen Xin
is not his superior, it is clear that Chen Xin's approval is still a happy
thing in his opinion.
However, while complimenting him, Chen Xin also asked the engineer: "Did you
excavate the foundation of the building first, and then construct other
supporting facilities?"
This is what Chen Xin was curious about when he inspected the construction
site just now. The workers were digging the foundation and digging very deep,
but they were basically limited to the scope of the construction planned on
the design drawings.
The part of the land outside this area has only been leveled, and no
excavation has been carried out.
However, according to the design drawings, various supporting facilities will
be built on the non-building part of the land, so Chen Xin has this question.
After all, this is an entire city, and it is impossible to just build houses,
and supporting facilities such as sewers, drainage pipes, and heating
pipelines will also be laid, not to mention city-level power supply lines and
dome lighting systems.
In the future, in this dome city, lighting will be used to simulate light
changes, so as to artificially create the difference between day and night.
"Yes, according to the construction plan, the progress of this phase is mainly
to excavate the foundation of the building. As for the supporting facilities,
according to the construction plan, construction will be carried out after the
foundation is completed." The engineer explained to Chen Xin, although Chen
Xin is not his boss, but Chen Xin's identity is undoubtedly more important
than his boss, and any questions he has engineers need to answer for him.
After listening to the engineer's explanation, Chen Xin didn't have any
special views or opinions. He didn't understand the construction of the
project, and he only asked what he didn't understand.
However, after the engineer explained, Chen Xin nodded pretendingly, without
asking more.
However, a designer on the side took the initiative to speak at this time and
said to Chen Xin: “This is mainly due to the special situation of the dome
city. According to our plan, the main construction of the heating energy tower
and the dome will be completed first. Then raise the temperature under the
dome to restore the temperature of the entire construction environment to
above zero. This will greatly reduce the difficulty of construction and allow
the original construction machinery to function."
Chen Xin can understand this. Most of the original construction machinery used
diesel, and when the diesel reached tens of degrees below zero, even high-
grade diesel could easily condense, causing the diesel engine to fail to
start.
Not to mention that these construction machinery themselves are very rough
designs, and the cab is not designed to be wind and cold. In this kind of
weather, even if the driver has protective clothing, the joystick will freeze.
But if the dome insulation can raise the temperature of the construction site
under the dome to above zero, these construction machinery that has been
unusable can naturally come in handy.
After all, even with the help of Engineering Titan, digging on frozen soil and
digging on ordinary soil are two completely different difficulties.
Therefore, when formulating the construction plan, someone proposed to
complete the dome and energy tower first, so that electricity can be obtained
through the energy tower to ensure the construction of the site, and the
temperature of the entire construction site can be warmed up by the heat
preservation of the dome and the frozen soil can be warmed up. Melt, reduce
the difficulty of construction.
"This has been determined before, but I am not worried." Chen Xin nodded and
talked about another thing: "The Dome City is an ecological city, and the
ecological environment is the most important for this city. Yes, so I hope you
can also pay attention to this issue during the construction process."
Since Chen Xin does not emphasize this issue, the design of the dome city
emphasizes its important role in ecological reconstruction. Therefore, all
parts of the entire city are built around the core of green ecology.
Not only are there all kinds of green plants in the city, the design of a
series of supporting facilities including the city's water cycle, garbage
disposal, etc. are all designed with the most environmentally friendly design,
so that the city can create the most perfect ecological environment in the
future .
The construction itself is the most ecological damage, even no matter how much
attention is paid during the construction process, this will still affect more
or less.
Chen Xin’s reminder also hopes to minimize its impact on the ecology during
the construction process.
Even if there is no ecology on the construction site of the dome city, this is
a problem that must be faced after the dome is built. If you do not prepare
now, it will be a big problem if there is a problem in the future.
Regarding this problem, both engineers and designers have already kept it in
mind, and they also paid attention to this point in the previous construction
process.
Now Chen Xin mentioned it again, and both of them nodded and said: "Please
rest assured, the academician, we will not be sloppy about ecological issues."
While guaranteeing Chen Xin, the engineers also emphatically introduced their
efforts during the construction process: "We strictly follow the construction
requirements during the construction process, and protect the environment and
ecology from the beginning. Implemented on everyone's head.
All workers have received relevant education and related responsibilities have
been clearly defined. We will make every effort to ensure that the entire
construction is foolproof.
Regarding the impact on the ecological environment during the construction
process, the recoverable part will be restored after the completion of the
construction, and the unrecoverable part will be minimized as much as possible
to ensure that the ecological and environmental impact during the construction
process is reduced. To the lowest. "
"I'm relieved to hear you say this." Chen Xin's smile even worsened when he
heard the engineer say this.
Now that it has been decided that he will live here in the future, Chen Xin
certainly hopes that his new home will have a better environment in the
future.