Skip to content

Chapter 834 of 835

Chapter 834: Print out the new city

5 min read1,269 words

Relying on various so-called "inside news", news that the new urban area will

be distributed mainly to couples with children soon spread.

Because of the instructions given by Chen Xin, and the high-level government

has already set the guidelines, the city government on the new city side did

not control the rumors. While allowing the rumors to spread, they were also

secretly working on the subsequent housing allocation. Prepare.

Send grass-roots staff to conduct statistics on existing residents, classify

them according to the situation, and make a preliminary count of the number of

people who need to allocate houses.

According to these preliminary statistical results, we will make a preliminary

distribution plan based on the number of houses in the new city...

Although the new city is still in the stage of laying foundations, these

preparations have been carried out in an orderly manner.

The construction of the new city area is progressing smoothly, even to the

point of lacklustre.

If it is a large dome, it may also be difficult due to the high construction

requirements and difficulty. However, the construction of a small dome that is

only a quarter of the large dome in the new city is much less difficult.

In addition, the construction team used 3D printing equipment to build the

dome of the new urban area, and both the difficulty of construction and the

speed of construction have been greatly improved.

So that after the foundation is leveled, the new city is still doing data

classification here, and a third of the dome and most of the houses have been

erected there.

Although most of the houses are just rough made with 3D printing technology,

they have already begun to take shape.

As the person in charge of the project, Chen Xin naturally wants to inspect

the construction of the new city, and the results of the inspection are

undoubtedly satisfactory.

3D printing technology is not a new invention. The 3D printing equipment

developed by Chen Xin only makes this technology more practical and more

convenient to use.

As for the use of 3D printing technology to build houses, in fact, this

technology has been applied long before the disaster.

Moreover, the built houses have great advantages in terms of anti-seismic,

thermal insulation, and sound insulation, as well as construction speed and

saving building materials.

It’s just that before the disaster, Yan Country was a big infrastructure

country with a large number of construction workers. At the same time, the

land was relatively expensive. 3D printing buildings were obviously not very

suitable. Therefore, although it has the world’s advanced level of 3D printing

construction technology, the application of this technology is It's not very

extensive.

However, in this environment, in order to save building materials and reduce

construction time and other factors, 3D printing construction technology has

begun to be widely used.

In addition to the construction of domes and buildings on the new city side,

this technology has also been applied to the construction of the Middle East

Defense Line.

According to what Chen Xin learned, because of the wide application of 3D

printing technology, whether it is equipment or fortifications, the

construction speed is at least twice as fast as that of the same period, and

work efficiency has been greatly improved.

The construction speed in the new city is not too slow. When Chen Xin

inspected, he could even see the gradual build-up of one floor of the building

with the naked eye.

"Look, academician Chen, the wall we are currently using 3D printing

technology to build is such a hollow structure, the interior is filled with

this kind of wavy line to stabilize the structure, which not only saves

building materials, but also improves construction efficiency. If it is If it

is built manually, both the construction efficiency and the construction

materials will consume more than it is now.” The engineer in charge of on-site

construction explained to Chen Xin with pride. Obviously, he is very proud of

this 3D printing construction technology. of.

Chen Xin can understand the pride of the engineer. In fact, he has the same

expression when he explains what he has made.

Therefore, Chen Xin did not interrupt the engineer's explanation, but let the

other party play freely.

Just noticing that the workers filled the wall with a kind of white scraps

after the wall was printed, Chen Xin still asked curiously: "What are you

adding?"

"It's an insulation material. Because the construction requirements stated

that insulation should be done, we filled in this insulation material. The

main components are asbestos and glass fiber. In addition to insulation, it

can also effectively play a role in sound insulation. The effect is very

good." The engineer explained to Chen Xin, and by the way, he took a little

thermal insulation material from the bag on the side and showed it to Chen

Xin.

After a brief glance at these insulation materials, Chen Xin nodded with

satisfaction: "You are doing a good job. The construction progress in the new

city is faster than expected. This is very good. We must continue to maintain

it. In addition, we must continue to pursue the construction speed. , And we

must not neglect the quality of construction, we must ensure that everything

meets the construction requirements and standards, and there are no hidden

safety hazards."

"Academician, don't worry!" On this issue, the engineer seemed confident. He

pointed to the 3D printing equipment at work and said: "People can make

mistakes, they can be negligent, but machines can't make mistakes. We will not

neglect, the quality of our project is definitely better than that of manual

construction!"

This is true. People may make mistakes, but as long as the machine does not

break down, there will be no mistakes, and the quality of the project is

absolutely stable.

Therefore, Chen Xin just smiled and encouraged this attitude of the engineer.

After a few more explanations, Chen Xin came to a building that had been

capped and started to decorate the exterior walls of the building, and

inspected a house that had already been renovated.

This is a 50-square-meter house. According to the design and planning,

UU看书www.uukanshu.com has two bedrooms and one living room, complete kitchen

and bathroom facilities, and can accommodate a family of three.

Because the total area is only 50 square meters, although the designer has

spent a lot of attention on the decoration to improve the comfort of use, the

room is still not large in general.

The two bedrooms are of the same size. One can be used by the couple and the

other can be used as a children's room. After all the decorations are

completed, the children's room can be divided into two relatively independent

spaces.

If the population of this family continues to increase, they can apply for a

larger house.

Although according to the currently discussed regulations, a family with two

children over the age of 5 can apply for a 70-square-meter house, but for now,

it will still be controlled according to the situation as much as possible.

And even if you apply, you may end up with a 50-square-meter house, because

the number of 70-square-meter houses in the entire new city is not much, about

one-fifth, and 50-square-meter houses are the most, with a third The second is

this apartment type, but the interior decoration and interior space division

are different according to the number of children.

As for the remaining part, it is a 30-square-meter apartment for families who

have just married without children or are planning to raise children.