Chapter 308 of 835
Chapter 308: Process parameters
5 min read1,228 words
Although arranging the production line is troublesome and requires a lot of
professional knowledge, but fortunately, professional things are done by
professional people. Chen Xin only needs to submit the drawings of the isotope
temperature difference battery to them, and explain the required materials and
related matters. Naturally, professionals are responsible for planning the
production line.
Chen Xin originally planned to come up with the design drawing of this
production line by himself, but when he was in the small shelter and the
construction staff confirmed the site conditions, the special team responsible
for working with him had already drawn it through military optical fiber
lines. The design drawings were sent over, and they were even printed.
This is not to say that the country is so powerful that the design drawings
can be released in such a short time. Even if the designers are forced to be
bald, they will not be able to submit the draft. This is not a matter of
determining the plan. It is not so short a time to complete the drawing.
In fact, this drawing is indeed not drawn now, but the country has already
started the design of the production line when it got the sample of the
isotope thermoelectric battery provided by Chen Xin.
At that time, the situation was not as bad as it is now, and the country still
maintains a certain means of communication, so all aspects of technical
communication are relatively smooth, and the plans are naturally determined
quickly and drafts are produced.
However, the reverse cracking progress of the isotope thermoelectric battery
has not been so fast, and the key technical indicators have not been
determined. Although a 10KW sample has been trial-produced in the laboratory,
it is still far away from the finalized production.
Therefore, the drawing has been in a draft state, and the final details have
not been completed.
This time, Chen Xin offered to establish a production line. After receiving
the news, the special team thought of this set of semi-finished drawings.
So it took a while, at the expense of a few designers who lost a lot of hair,
perfected the design drawings and sent them through military fiber optic
lines.
Of course, even though there are several designers, there are no specific
technical parameters. Although this drawing has been perfected, it is still
impossible to build a production line based on this.
Because there is no specific technical parameters, I don't know what kind of
equipment to use, I can barely fix the equipment to make do with it, and I
don't know what to produce.
After all, what they want to produce is the isotope thermoelectric battery,
which is a dangerous item with high radioactivity, not a three-no product that
can be used in a black workshop.
This highly radioactive product requires extremely high precision in the
production process. Any small error is likely to cause radiation leakage or
brew more terrible consequences, so after the scientific researcher got the
blueprint, he went to Chen Xin , I want to confirm with him the process
standard of the production line.
However, this is difficult to renew. Although he can make isotope
thermoelectric batteries, he can also make the production line with the
upgrading ability of the system, or adjust it to the best state directly after
the production line is set up, but he has to let him Speaking out the
corresponding production line process parameters, this is obviously not a
question he can answer.
However, this is not unimaginable. Since the country is able to trial-produce
a 10KW isotope temperature difference battery, it is obvious that it has
already had enough in-depth understanding of this product and technology
before attempting trial production. Chen Xin can learn from their imitated
technical parameters.
Using these data as a reference, first set up the production line, and then
Chen Xin will "debug" the production line through system upgrades, so that the
production line can meet production needs, and even improve the efficiency of
the production line to make the products produced The yield rate is higher to
avoid wasting materials.
For Chen Xin to let them directly use the existing data as a reference, this
obviously made the researchers of the research institute feel uncomfortable.
After all, the establishment of a production line must first establish what
product to be produced, how much to produce, and the specific process
parameters of the product before it can establish and design production
equipment based on these data, because there is no such thing in this world
that can produce all products. Production equipment, and the production line
is even more so.
The reason why the von Neumann machine in science fiction works is science
fiction is that it can produce all the equipment, even copy itself.
Of course, as technologies such as 3D printing are invented, universal
equipment is gradually appearing, but at present, there is no production line
that can adjust process parameters at any time to produce any product.
Different process parameters will produce different products. If you want to
adjust process parameters, you must modify the entire production line.
This requires a lot of resources and time. If it were not for Chen Xin's
ability to upgrade, he would not dare to say that he could do such a thing.
However, Chen Xin's abilities, these researchers also understand, they can
understand the reason why Chen Xin can't come up with specific process
parameters, so they didn't say much, and designed production lines and
equipment with imitation process parameters according to his suggestions.
In fact, these scientific researchers also have their own ideas. In their
opinion, they can also adjust these production data with the help of Chen Xin,
so as to find out why the power of the products imitated by the laboratory
cannot reach the power of the samples provided by Chen Xin. level.
After all, the gap between the output power of 10KW and the output power of
160KW is too big even if there are technical reasons.
In addition to the problem of production process parameters, there is another
important thing that has attracted Chen Xin's attention.
"Under this situation, how do the equipment on the production line get in?"
Chen Xin asked the researchers. This is also the biggest problem now.
After the city government mobilized enough manpower, the site has been
gradually cleared out. The process parameters are also sorted out by the
laboratory, and Chen Xin can be adjusted later. Generally speaking, there is
no big problem.
But how to transport the equipment to this city and how to install it in the
factory is a difficult problem.
Due to the blizzard, all railway services are now in a state of serious
delays. Although trains can still deliver things to their destinations, in
order to avoid the threat of strong winds, these trains not only go very
slowly, but also often need to stop. To avoid strong winds, it is obviously
not a smooth transportation state.
Under such circumstances, it is very problematic to ensure coal supply, not to
mention freeing up transportation capacity to transport industrial equipment.
However, the researchers only had one sentence to answer Chen Xin: "Please
rest assured, the special team has specially deployed a special train for this
purpose and will bring in all the necessary equipment."