Chapter 309 of 835
Chapter 309: Nuclear power train
5 min read1,272 words
Although the scientific researchers answered Chen Xin with only one simple
sentence, what is behind this sentence is the hard work of many people.
In Jianning, another city in Hunan province not far from Chen Xin's city,
workers are intensively debugging a brand new train in the factory.
The meteorite falling from the sky not only brought dusty nights, but also
destroyed the railway power supply lines that were originally all over the
country, so that the country can only take out the old coal-fired steam
locomotives for reuse, and the original electric locomotives are no longer
available. Most of them are lying down.
Although there are still some fuel locomotives that can be used, due to fuel
shortages, all these movable fuel locomotives have been deployed to the most
critical places to be responsible for the transportation of the most critical
materials.
But in addition, comrades on the railway front have also been thinking of ways
to restore railway capacity.
The train they are currently debugging is a new train specially researched and
developed by Jianning's train factory to restore railway capacity.
The carriage of the train has been specially designed for heat preservation,
cold protection, frost resistance and wind resistance. While thickening the
carriage wall, it also increases the stability of the car body.
According to the original design indicators, this new car needs to deal with
ten-level winds and a low temperature of minus 50 degrees, but now it is clear
that this car needs to face more severe challenges.
The workers in the manufacturing plant adjusted and reinforced it, added a
counterweight to the body, and replaced the thermal insulation material in the
compartment wall to ensure that it can still have sufficient thermal
insulation in an environment of minus 70 degrees.
Because this train is not only used to transport some valuable materials, it
is also an attempt by the state to restore personnel transportation.
Before the disaster, Jianning was an important train production base in Yan
Country. The locomotives produced here are also famous for Yan Country. Even
the trains running on Yan Country's important high-speed railway lines are
mostly produced here.
Therefore, for the workers of Jianning Train Manufacturing Plant, they are
quite rich in technology and experience.
In fact, before the disaster, they had already developed high-speed trains
that could still operate normally at a low temperature of minus 40 degrees.
Now they have only optimized the technology.
Only after the disaster, the railway power supply network across the country
was destroyed. Electric locomotives lost power and could no longer operate
normally. The original advanced electric locomotives were slumped. Even if
they were not damaged by electromagnetic pulses, they could not operate due to
lack of electricity.
After all, the curb weight of an ordinary trunk freight locomotive is as high
as 240 tons, and the traction power reaches 9600KW. Without surging power
supply, it is impossible to move this behemoth.
Therefore, the focus of the debugging of this new car is actually the front
power system, not the carriage.
Because power can no longer be supplied through the transmission line, it is
now necessary to let the front of the car itself generate power.
This is still very easy to achieve. Whether it is burning coal or oil, it can
drive a steam turbine to generate electricity, thereby providing sufficient
power for the entire train.
However, this new train built by the workers at the Jianning Train Factory
does not use an internal combustion engine as a power source, but a small
nuclear reactor.
This is a nuclear-powered locomotive.
The reactor used is Yanguo’s own technology, which was originally used on
nuclear submarines, but because of technical limitations, the volume has not
been reduced, and it cannot be applied to trains and civilian ships.
Moreover, the tonnage of nuclear submarines ranges from several thousand tons
to tens of thousands of tons. The reactor that can drive nuclear submarines is
too powerful for a train. If you want to apply it to trains, you must reduce
the size and reduce the power. .
However, this is not something that can be easily done. Except for the nuclear
charging part of the reactor itself, related supporting equipment will occupy
a huge space. A compartment is specially designed on the submarine to provide
a place for nuclear reactors. This can be done on warships, but obviously not
on trains. There is not such a big place.
However, Chen Xin’s isotope thermoelectric battery gave researchers a lot of
inspiration and technical support, allowing them to successfully miniaturize
the reactor on the original nuclear submarine, and improve the related
technology, to successfully build a train that can be installed on a train.
Small nuclear reactor on board.
This reactor is not a traditional light water reactor, but a thermoelectric
conversion type similar to an isotope thermoelectric battery, which directly
converts heat energy into electrical energy.
There are many benefits of this. The core full of radioactivity can be
completely sealed to prevent radiation leakage, because it only needs to
conduct heat and convert it into electrical energy, instead of injecting
cooling water into the reactor to boil the water to drive the steam turbine to
generate electricity. In terms of efficiency, the former is naturally more
efficient.
With such a small nuclear reactor, driving a train has become a very easy
task, even if the traction power of a passenger train has more than 5600KW.
Because the general small nuclear reactor refers to a reactor with an output
power of less than 300MW, 1MW is 1000KW, if you want to drive a train, only
10~15MW of power is enough.
The output power of the small reactor currently installed on this new train is
35MW. In addition to driving the train itself, it can also provide plenty of
electricity for the body for heating, lighting, and a series of electricity
needs, including deicing. And wrecking.
This project was established and started research three months before the
meteorite fell, and the manufacture of the car body began at that time.
The progress of other parts is very fast, the only limitation is the power
system~www.mtlnovel.com~ This is not until Chen Xin provided the country with
isotope temperature difference batteries, the restrictions were lifted, and
this new train finally successfully moved. Off the production line, it is
about to be put into operation.
The first task of this new nuclear-powered train is to transport production
equipment to the city where Chen Xin is located.
It is the special train mentioned in what the researchers told Chen Xin.
Its successful operation is not only the improvement of railway transportation
conditions and the increase of capacity, but also a more convenient and safer
way of nuclear power application.
The power generation of the small nuclear reactor used on the train is enough
to supply all the electricity used in a small county before the disaster. In
this case, if a city can have a small nuclear reactor, then the entire city’s
electricity will be used. There is no need to worry at all, and even the
heating method can be converted into electric heating.
The reason why Yan Guo did not do this before was because there were too many
technical problems that could not be solved, and it was too late to build a
new nuclear power plant temporarily, so this method was not used to power the
shelter before the disaster.
But now that safe and reliable small-scale nuclear reactor technology is
available, the senior officials of Yan Guo will obviously not let go of such
clean, efficient and convenient energy.